No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi |
---|---|---|---|---|
1 | PT. BINA MITRA ARTANAMI | 01.974.661.9-122.000 | Rp. 305.955.100,00 | Rp. 305.955.100,00 |
2 | CV. Arkade Enam Pilar | 31.189.513.0-111.000 | ||
3 | CV. Bisma Kasada | 01.699.642.3-121.000 | ||
4 | andal peperine consultant | 01.457.374.5-111.000 | ||
5 | CV.Dexa Tama Consultant | 31.747.139.9-122.000 | ||
6 | CV. PELITA BUANA | 02.996.788.2-122.000 | ||
7 | cv.citra pramatra | 01.536.486.2-121.000 | ||
8 | CV. PRESISI TAMA | 21.044.824.7-122.000 | ||
9 | CV. BIRAMOS CONSULTANT | 01.228.403.0-113.000 | ||
10 | CV. ABDI KRIASY KONSULTAN | 02.094.145.6-121.000 | ||
11 | PT. ARTEK UTAMA | 01.536.410.2-121.000 | ||
12 | CV. KREASI PERSADA | 02.996.850.0-121.000 | ||
13 | CV.BRIAN GROUP | 74.882.866.2-127.000 | ||
14 | CV. MITRA SETIA | 75.136.316.9-126.000 | ||
15 | PT. MANGISI MAKMUR SENTOSA | 01.394.456.4-011.000 | ||
16 | CV. CITRA MANDIRI CONSULTANT | 01.516.351.2-124.000 | ||
17 | PT. BUMI TORAN KENCANA | 01.763.460.1-121.000 | ||
18 | PT. Arangsibu Raya Consultant | 01.532.193.8-122.000 | ||
19 | CV. RAJAWALI ENGINEERING CONSULTANT | 83.910.198.7-124.000 | ||
20 | CV. IHA KONSTRUKSI | 75.643.175.5-101.000 | ||
21 | CV. MARCO LOUIS | 80.832.174.9-127.000 | ||
22 | CV. Balakosa Consultant | 71.989.792.8-124.000 | ||
23 | PRIMA JAYA SOLUSINDO | 80.457.745.0-122.000 | ||
24 | CV. POLO CONSULTANT | 01.801.407.6-121.000 | ||
25 | CV. TEAM CORE CONSULTANT | 03.096.337.5-121.000 | ||
26 | cv.haza mulia engineering | 31.504.658.1-122.000 | ||
27 | CV. INGRACE CONSULTANT | 02.366.357.8-127.000 | ||
28 | CV. EFOD DESIGN CONSULTANT | 74.579.916.3-117.000 | ||
29 | CV. KREATIF CIPTA PRATAMA | 02.996.849.2-121.000 | ||
30 | CV. SPORTIF CITRA MANDIRI | 02.996.848.4-121.000 | ||
31 | PT. MATARAM SURYA CIPTA | 31.518.565.2-122.001 | ||
32 | CV. BILLINDO ENGINEERING CONSULTANT | 02.263.005.7-124.000 | ||
33 | PT. WIJOKSONO JAYA SAKTI | 31.509.619.8-445.000 | ||
34 | CV. PRIMA RANCANG | 01.975.189.0-121.000 |